Back
Table of Changes

Infrastructure RT

Track, Structures, Stations & Fixed Infrastructure

RT - Railway Group Standards

Search for: In:
 
Doc No. Issue Date Issue No. Document Title

  GC/RT5021 April 2007 3 Track System Requirements
This document mandates requirements for track geometry, track system, track components and switches and crossings to provide for the safe guidance and support of rail vehicles.


  GC/RT5033 Issue 2 December 2007 2 Terminal Tracks – Requirements for Buffer Stops, Arresting Devices and End Impact Walls
The principle change has been the withdrawal of measures relating to the inspection and maintenance of buffer stops and arresting devices. The requirements have also been clarified to make it explicit that all terminal tracks must be provided with a buffer stop or areresting device and the opportunity has been taken to incorporate a non-mandatory appendix giviging advice on the provision of end impact walls. In addition, and partly to more closely reflect the revised contents of the document, the title been changed.


  GC/RT5112 May 1997 1 Loading Requirements for the Design of Bridges
This Railway Group Standard sets out the minimum loading requirements to be considered in the design of bridges.


  GC/RT5203 February 2001 3 Infrastructure Requirements for Personal Safety in Respect of Clearances and Access
This document sets out the design, construction and maintenance requirements for means of access onto, along or across running lines that are provided for authorised people. It specifies the requirements for physical measures for control of risks to authorised people from moving rail vehicles and from tripping hazards.
There are associated amendment(s), technical notes, briefing notes, non-compliance certificates etc relating to this document. Please click here to view.


  GC/RT5212 February 2003 1 Requirements for Defining and Maintaining Clearances
This document mandates requirements for monitoring and maintaining clearances. It also mandates requirements for new, altered and temporary infrastructure relating to clearances; gauging conditions for passage of exceptional loads; standard vehicle gauges; and data relating to gauging and clearances, to be provided to Railway Group members and their suppliers.


  GE/RT8006 December 2000 1 Interface between Rail Vehicle Weights and Underline Bridges
This document sets out the requirements for managing the risk of overloading of underline bridges by rail vehicles.
There are associated amendment(s), technical notes, briefing notes, non-compliance certificates etc relating to this document. Please click here to view.


  GE/RT8073 April 2008 1 Requirements for the Application of Standard Vehicle Gauges
This Railway Group Standard supersedes parts of GE/GN8573 issue one and is supported by GE/GN8573 issue two.
There are associated amendment(s), technical notes, briefing notes, non-compliance certificates etc relating to this document. Please click here to view.


  GI/RT7015 February 2003 1 Automatic Ticket Gates at Stations
This document mandates the requirements for the installation of automatic ticket gates at stations, and for carrying out modifications to existing automatic ticket gates.


  GI/RT7016 December 2007 2 Interface between Station Platforms, Track and Trains
It replaces issue 1, and incorporates some requirements from GI/RT7014, issue 1, Infrastructure Requirements at Stations, GI/RT7010, issue 1, Lighting of Railway Premises and GE/RT8060, issue 1, Technical Requirements for Dispatch of Trains from Platforms.
There are associated amendment(s), technical notes, briefing notes, non-compliance certificates etc relating to this document. Please click here to view.


  GI/RT7019 December 2007 1 Safety in Railway Tunnels - Requirements for Lighting
Supersedes section G9 of GI/RT7010, issue 1, Lighting of Railway Premises.

Search for: In: